Contrex M-Shuttle Manuale Utente

Navigare online o scaricare Manuale Utente per Sensori Contrex M-Shuttle. CONTREX M-Shuttle User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 4
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
M-SHUTTLE INSTALLATION/START-UP GUIDE
CAUTION
Hazardous Voltages. Can cause severe injury, death or damage to
equipment. The M-Shuttle should only be installed by a qualified
electrician.
Proper earth grounding of all electronic equipment is required for
successful operation. Connect a low impedance earth ground to
terminal 1 of connector J2.
Separate all logic and signal level wiring (J1, J3, and J4) from all
AC power wiring (J2).
Shield all logic and signal wiring (J1, J3 and J4) and terminate to
earth ground at one point only.
TYPICAL WIRING
*1 Encoder and Proximity Switches may require power connections from J3 pins 1 or 2.
*2 J1 pin 8 connection is not required for drives with differential inputs. Refer to User Manual Page 2-4 for jumper
requirements using 2 wire drive connections.
CC
CC
C
ONTREX, INC.ONTREX, INC.
ONTREX, INC.ONTREX, INC.
ONTREX, INC.
SK1456 Rev 1SK1456 Rev 1
SK1456 Rev 1SK1456 Rev 1
SK1456 Rev 1 Page 1
Vedere la pagina 0
1 2 3 4

Sommario

Pagina 1 - TYPICAL WIRING

M-SHUTTLE INSTALLATION/START-UP GUIDECAUTIONHazardous Voltages. Can cause severe injury, death or damage toequipment. The M-Shuttle should only be in

Pagina 2 - PROGRAMMING

MOTOR DRIVE SET-UPIn order to provide for proper closed-loop operation, it is necessary to calibrate the motor drive maximum speed andresponse adjustm

Pagina 3

CP-15 Engineering UnitsEnter into CP-15 a commonly used Follower Setpoint in Engineering Units. Place the decimal point in the desiredlocation for all

Pagina 4

CP-12 Process RatioThe Process Ratio is the desired ratio of Follower lines to Lead lines (Follower lines/Lead lines) duringthe Process Length segment

Commenti su questo manuale

Nessun commento